INSTALLATION GUIDE
Husqvarna Automower 315 Mark II installation procedure
Physical boundary-wire Automower installation · Automower Connect
Important: This is a MowerFixAI installation workflow, not a replacement for the product manual. Exact cable offsets, station clearances, slope limits, electrical requirements and positioning accessories vary by model/year. Follow the manufacturer manual where it differs.
Step-by-step installation
- Step 1. Plan the lawn, charging-station position, boundary route, islands, passages and guide-wire route before fixing cable.
- Step 2. Place the charging station on suitable level ground with power available and the required clear approach.
- Step 3. Lay the boundary wire around the work area and obstacles according to the exact model manual; stake or bury it.
- Step 4. Lay the guide wire from the station through useful passages/remote areas and join it to the boundary loop; connect boundary/guide leads to the labelled station terminals.
- Step 5. Power the station, charge/start the mower, complete language/PIN/start-up settings and allow loop/guide calibration.
- Step 6. Test docking, narrow passages and remote areas before permanently burying or tidying the installation.
Before the first unattended mow
- Confirm blades and underside are clear and guards/covers are fitted.
- Verify charging and docking repeatedly.
- Check boundaries/no-go zones beside roads, water, drops, steps and public areas.
- Supervise the first full mowing cycle and correct any unsafe or unreliable area before normal operation.
Manufacturer/support starting point
Diagnose a mower problem