INSTALLATION GUIDE
Husqvarna CEORA 544 EPOS installation procedure
EPOS virtual-boundary installation · Automower Connect
Important: This is a MowerFixAI installation workflow, not a replacement for the product manual. Exact cable offsets, station clearances, slope limits, electrical requirements and positioning accessories vary by model/year. Follow the manufacturer manual where it differs.
Step-by-step installation
- Step 1. Plan the work area and choose a charging-station position with reliable power and a clear operating approach.
- Step 2. Install and power the charging station, charge the mower, then install/open Automower Connect and pair the mower.
- Step 3. Enable/configure EPOS. Depending on the model and market this can use supported cloud correction or a reference station/EPOS hardware.
- Step 4. Use appDrive/map tools to create the work area by driving the mower around the lawn and placing boundary points.
- Step 5. Add stay-out zones and transport paths where required, save the map, set cutting height/schedule, then test docking and coverage.
Before the first unattended mow
- Confirm blades and underside are clear and guards/covers are fitted.
- Verify charging and docking repeatedly.
- Check boundaries/no-go zones beside roads, water, drops, steps and public areas.
- Supervise the first full mowing cycle and correct any unsafe or unreliable area before normal operation.
Manufacturer/support starting point
Diagnose a mower problem